DLP Manager — Smarter handover, stronger assets

Deliverables Explorer

Handover a financially stable asset.

DLP Manager takes your existing construction documentation and turns it into four connected deliverables. The Initial Maintenance Schedule, Capital Works Plan, Scopes of Work and O&M Manual, all built from one asset register, so nothing disagrees and nothing gets missed.

Certified before your first AGM deadline. Every figure traceable back to your drawings, for the life of the building.

The outcome: a financially stable asset handed over, with the evidence to prove it — not just paperwork.

Structure, figures and task details are live samples of what DLP Manager delivers.

Initial Maintenance Schedule

Excel workbook extract
A certified Initial Maintenance Schedule is required before the first AGM. Built straight from your drawings, it's ready well ahead of the deadline — no scramble, no gaps.

This is the actual workbook a client receives: one row per asset task, costed by trade. Select a trade to filter the sheet.

Assets in this trade

3

Line items scoped under Architectural.

Indicative annual cost

$7,534

Annualised across all tasks in this trade.

Cost basis

Excl. GST

Excl. GST, today's dollars.

CodeAsset TypeTradeLocationQtyTask DescriptionFrequencyMaint/InspAnnualised cost
AR-BH-01Bin HoistArchitecturalGround floor waste room2
  • Inspect lifting chains, cables, and pulleys for wear, tension, and proper lubrication
  • Test all safety interlocks, emergency stop buttons, and gate sensors to ensure safe operation
  • Check hydraulic systems (if applicable) for fluid leaks, hose degradation, and correct pressure levels
6 MonthlyMaintenance$2,794
AR-FB-01Flood BarrierArchitecturalBasement 1 vehicle entry3
  • Deploy barrier and confirm full seal against frame and floor plate
  • Inspect gaskets and seals for compression set, tearing or perishing
  • Lubricate hinges, latches and confirm storage bracket condition
6 MonthlyInspection$1,480
AR-RS-01Roller Shutter / Garage DoorArchitecturalCarpark entries4
  • Test auto-reverse safety beams and manual release operation
  • Lubricate tracks, rollers and drive chain; check tension
  • Inspect curtain, bottom rail and motor mount fixings
  • Confirm remote and intercom triggers operate on all channels
QuarterlyMaintenance$3,260
Total (Architectural, excl. GST)$7,534

Extract only. The delivered workbook also carries model, installer and manufacturer contacts, warranty and manual links, duration, route efficiency loading, pricing method and contract rate references.