Deliverables Explorer
Handover a financially stable asset.
DLP Manager takes your existing construction documentation and turns it into four connected deliverables. The Initial Maintenance Schedule, Capital Works Plan, Scopes of Work and O&M Manual, all built from one asset register, so nothing disagrees and nothing gets missed.
Certified before your first AGM deadline. Every figure traceable back to your drawings, for the life of the building.
The outcome: a financially stable asset handed over, with the evidence to prove it — not just paperwork.
Structure, figures and task details are live samples of what DLP Manager delivers.
Initial Maintenance Schedule
Excel workbook extractThis is the actual workbook a client receives: one row per asset task, costed by trade. Select a trade to filter the sheet.
Assets in this trade
3
Line items scoped under Architectural.
Indicative annual cost
$7,534
Annualised across all tasks in this trade.
Cost basis
Excl. GST
Excl. GST, today's dollars.
| Code | Asset Type | Trade | Location | Qty | Task Description | Frequency | Maint/Insp | Annualised cost |
|---|---|---|---|---|---|---|---|---|
| AR-BH-01 | Bin Hoist | Architectural | Ground floor waste room | 2 |
| 6 Monthly | Maintenance | $2,794 |
| AR-FB-01 | Flood Barrier | Architectural | Basement 1 vehicle entry | 3 |
| 6 Monthly | Inspection | $1,480 |
| AR-RS-01 | Roller Shutter / Garage Door | Architectural | Carpark entries | 4 |
| Quarterly | Maintenance | $3,260 |
| Total (Architectural, excl. GST) | $7,534 | |||||||
Extract only. The delivered workbook also carries model, installer and manufacturer contacts, warranty and manual links, duration, route efficiency loading, pricing method and contract rate references.
